Home > Back-end >  The minimum time to complete this section of the road, don't know what to use which kinds of me
The minimum time to complete this section of the road, don't know what to use which kinds of me

Time:09-27

There is a need to pave the road asphalt, known:

1. This section of the road is not the average divided into n segments, each in different working hours;

2. Construction group have m workers;

3. Every worker can be responsible for a road or more;

4. Each worker can only be responsible for continuous highway;

5 m less than or equal to the number of workers n


6 workers are not allowed to cooperation
7 start construction at the same time

To complete this section of the road, the minimum time

The input description

3 (n)

3 1 4 hours) need to complete road (each

2 (number of workers)