There is a need to pave the road asphalt, known:
1. This section of the road is not the average divided into n segments, each in different working hours;
2. Construction group have m workers;
3. Every worker can be responsible for a road or more;
4. Each worker can only be responsible for continuous highway;
5 m less than or equal to the number of workers n
6 workers are not allowed to cooperation
7 start construction at the same time
To complete this section of the road, the minimum time
The input description
3 (n)
3 1 4 hours) need to complete road (each
2 (number of workers)