Home > Back-end > Link to the server, and for the first time by date range, correct statistical confusion again! To so
Link to the server, and for the first time by date range, correct statistical confusion again! To so
Time:09-30
As title, with links to the SQL server, assuming three A, B, C material, according to the material sort by date, first open software run correctly, return again to open the statistical aberration, should be the following order: 1-1 A 1-2 A 1-3 A 1-1 B 1-2 B 1-3 B 1-1 - C 1-2 - C 1-3 C Return window again statistics is to always have A material not by date, A date inserted into other materials, this is what problem, leading to? Code for a very long didn't post 1-1 A 1-1 B 1-2 B 1-3 B 1-2 A 1-3 A 1-1 - C 1-2 - C 1-3 C
CodePudding user response:
Want to order get a normal order by soon come,
CodePudding user response:
normal count statistics is wrong again, but each is different, unless the software all over again open the statistics is right,
CodePudding user response:
By date range statistics, the X represents a stock before, each of the remaining should correspond to the material, if there is no word on behalf of no inventory