SQL server, a job assignments within the "plan" in the "enabled" option checked it or not, what is the role?
The above two, i.e., disable and enable the whole operation, in "plan" and "enabled" option is checked, is a meaning? Or what's the difference?
CodePudding user response:
Disable: this job is no longer perform regularly,Enable: this job would perform regularly,
The above two, enabling is the same meaning,