Home > Net >  For a simulation grid algorithm or train of thought
For a simulation grid algorithm or train of thought

Time:11-08

Need to simulate a power grid, the grid consists of two elements, nodes and the attachment
Each node may be power supply, or electricity;
May each node and link N nodes (N>=0);
The connection to the grid, nodes are in change at any time;
Need real time of each node in the grid power supply,

CodePudding user response:

Directly using secondary, check, of course, is likely to block the. After all, a large topology are large amount of calculation of

Certainly recommend using secondary
1. Secondary, itself is a graph databases, for you this description
2. To itself, now big data analysis of the electric power industry, most of the data is secondary

This is, of course, data query and analysis for operational tuning, personally, just say whether each node has a power supply, I will not rely on chart, I will rely on the Internet of things devices, equipment alarm you give me I will naturally know, why I use also difficult to check the library?

CodePudding user response:

Data structure is more important
  •  Tags:  
  • C#
  • Related