Home > other >  Company network structure: telecom broadband - 200 million h3c520 router (dhcp192.168.20.254) came o
Company network structure: telecom broadband - 200 million h3c520 router (dhcp192.168.20.254) came o

Time:11-18

To the office computer, now the problem is often the entire network card dead or not network! Excuse me each great god is that a problem

CodePudding user response:

Waiting for reply

CodePudding user response:

The first feeling, in 8 mouth exchange of the above,

CodePudding user response:

refer to the second floor z275238202 response:
the first feeling, above 8 mouth exchange,

Forget to say the company is about 200 PCS

CodePudding user response:

Key points on the vlan do three layers, the speed limit on a router do strategy, see your switches support does not support

CodePudding user response:

We also have a h3c switches should support the just how three layers can be divided into core interaction detail it for me?

CodePudding user response:

TP - link the switches, should be with your 200 machines, why not get rid of eight switches directly?

CodePudding user response:

refer to 6th floor Iforgetmyid response:
TP - link the switch, it should be with your 200 machines, why not get rid of eight switches directly?

But it is still a gigabit switch

CodePudding user response:

refer to 7th floor qq_40624584 response:
Quote: refer to the sixth floor Iforgetmyid response:
TP - link the switches, should be with your 200 machines, why not get rid of eight switches directly?

But it is still a gigabit switches


With thousands of not gigabit switch exchange capacity is to look at the back of bandwidth,

CodePudding user response:

TP 8 mouth what switches... feeling same as above should be the problem in the 8 mouth you switch on the particular model is what? ~

CodePudding user response:

TP issue, back exchange capacity is insufficient, can change the H3C5130, or H3C 3600 series

CodePudding user response:

references to the tenth floor Zhao Peichao response:
TP, backplane exchange capacity is insufficient, can change the H3C5130, or H3C 3600 series

Ok, I change a malicious switches in a try

CodePudding user response:

references 9 f tangxudong142 response:
8 mouth what switches TP feeling... ditto was supposed to be the problem in the 8 mouth you switch on the particular model is what? ~

Specific models don't remember, anyway is less than 200 pieces of the jingdong

CodePudding user response:

Ladies and gentlemen, yesterday I in China a 24 at the mouth of the three switches, and then restart the router but card again and it is a burst of card in the afternoon

CodePudding user response:

Detail your network under the condition, first, you change the 24 three mouth China what type, you are the second level three 24 three mouth China what type, second, how many PCS you entire network have got altogether, third, the routing is doing the speed limit, according to the kind of networking, you lower PC has used a large flow is likely to drag across your entire network, the second you this problem phenomenon like LAN ARP virus,

CodePudding user response:

Routing speed first, secondly when speed is slow, unplug all TP switches, on the core test speed, no problem, then put up TP one out, the indigenous method, the hope can help you or VLAN solution, let try TP can not visit each other between

CodePudding user response:

So little not the kui is a great god, and how to analyze the condition of the problem

CodePudding user response:

Don't know why become like this, the topology but what is certain is that in the switch after a while of time will still have a question, change the switch still useless,

This kind of situation, it certainly is not ready, the router with network strategy 200 computers might produce a broadcast storm does not necessarily

And the 200 m wide telecom broadband is home or enterprise wide or the shuttle don't know, home with enterprise wide width will limit the number of connections

Advice directly on a soft routing, switches, don't use the TP, directly to the above new routers, do routers VLAN division, look at the situation again,

CodePudding user response:

TP eight switches must be changed, this is cannot make the core switches, the access layer 3 switches, three China off the electricity, of a first look at the other two work za sample, correct, narrow range,

CodePudding user response:

200 piece of TP can move 200 PC giant sweat! Not someone said, directly on the layer 3 switches, China three 5130 is ok, you see problems in the present small and medium-sized enterprises is very long, is a big family of network structure, the last three put gateway in three layers, the router will only do export, will stabilize, 200 units of the enterprise on the three layers of a 4-5 k is very affordable,

CodePudding user response:

Should be you of eight TP (core switches) back enough bandwidth, large amount of data, packet loss
  • Related